← Dispatch

Sort your scopes by what you need to know next

Nov 2026

New map

Bid day, laid out

Concrete and structural steel bids are due this week. Masonry and roofing follow next week, millwork the week after, and 32 more packages don’t have a date yet. That’s a normal precon calendar, and until now the map showed it to you in CSI order.

Now the map can organize your scopes three ways: by CSI division, by bid date or by stage. Drawings and specs stay put whichever you pick, and Filter narrows any of them down to what you’re hunting for.

Scope cards on the Struction map grouped by bid date into four columns: No bid date with 32 scopes, Wave 1 bids due Nov 30 with Cast-in-Place Concrete and Structural Steel, Wave 2 bids due Dec 7 with Masonry and Roofing, and Wave 3 bids due Dec 14 with Millwork.
The scope band grouped by bid date. No bid date holds the 32 packages that don’t have a Bids due date yet. Wave 1, bids due Nov 30, has Cast-in-Place Concrete and Structural Steel. Wave 2, due Dec 7, has Masonry and Roofing, and Wave 3, due Dec 14, has Millwork. Each card keeps its stage label, such as Carried, Leveled or Drafted.

How to

Switch the grouping from Display

  1. Open a project’s map and click Display in the toolbar at the top left.
  2. Find Group scopes by. It’s set to Division until you change it.
  3. Pick Bid date or Stage.

The map remembers the choice. Reload the page and your scopes are still grouped the way you left them.

The map’s Display menu with Layout set to Standard and the Group scopes by list open, showing Division, Stage and Bid date, with Bid date checked.
The Display menu, opened from the map toolbar. Layout is set to Standard, and the Group scopes by list shows Division, Stage and Bid date, with Bid date checked.

Division

Check every spec section against a package

Division is the default. Spec sections are grouped in CSI division columns, and each scope card appears directly below its division.

The number beside each division name counts the spec sections tied to a scope, out of the total. 26 Electrical reads 12/15, so three of its fifteen sections aren’t in any package yet. Those three are grayed out with a dashed edge.

Any division where the two numbers don’t match has spec sections nobody has been asked to price. Check those before bids go out.

The map grouped by division, with spec sections for 21 Fire Suppression (3/3), 22 Plumbing (16/16), 23 HVAC (22/23), 26 Electrical (12/15) and 27 Communications (15/16) along the top. Sections not tied to a scope are grayed out with a dashed edge. Below are the scope cards for each division: Fire Protection, Plumbing, HVAC/Mechanical, Electrical, Solar Photovoltaic and Low Voltage/Communications.
Spec sections for 21 Fire Suppression through 27 Communications, with each division’s scope cards below. The count beside each division name is sections tied to a scope out of the total, so 26 Electrical’s 12/15 means three aren’t in any package. Those three are grayed out with a dashed edge, as is one section each in 23 HVAC and 27 Communications.

Scope cards

Read a scope card

Every scope card shows the same things in every grouping. The package name and CSI code are at the top left, and its stage is at the top right.

The four tiles underneath are Risks, Qty, Level and Schedule:

  • Risks counts open risks, RFIs and scope gaps together, and turns orange when there are any. Hover it for the split, like 1 risk, 7 RFIs and 2 scope gaps.
  • Qty opens the package’s quantities and shows a count when it has some.
  • Level shows bids received out of bidders invited, like 3/3.
  • Schedule opens the package’s schedule.

A dashed tile has nothing in it yet. Double-click any tile to open that work in the side panel.

Two scope cards. HVAC/Mechanical shows Risks 12, Qty 3, Level 3/3 and an empty Sched tile. On the Electrical card the cursor is over Risks 10, and a tooltip reads: 1 risk · 7 RFIs · 2 scope gaps. Double-click to open issues.
Two scope cards. HVAC/Mechanical shows 12 open risks, 3 quantities, 3 of 3 bids in and an empty Schedule tile. On Electrical, the cursor is over Risks, and the tooltip breaks its 10 into 1 risk, 7 RFIs and 2 scope gaps. Dashed tiles, like Electrical’s Qty and Schedule, have nothing in them yet.

Bid date

Line up your bid waves

Group by Bid date and each scope moves into a column for its Bids due date, which you set on the scope’s Schedule tab. Columns are numbered in date order, so Wave 1 is due first.

Each date gets its own wave. Packages due the same day share one, and a package due even a day later starts the next wave.

Packages without a date wait under No bid date, with a count beside it. Cards keep their stage label in this view, so a Drafted card in Wave 1 is a package that’s due first and hasn’t gone out to bid.

Click a card to see what it covers. In the shot below, Roofing is selected: its card gets a blue outline, the rest of the map fades, and blue lines run up to the spec sections and sheets its scope includes. The panel on the right is open to its Schedule tab, where Bids due matches the Wave 2 header.

The map grouped by bid date with the Roofing card selected in the Wave 2 column, bids due Dec 7, and the Roofing scope’s Schedule tab open on the right showing Bids due Dec 7, 2026 at 12:00 AM.
Roofing selected with the map grouped by bid date. Its card has a blue outline, the rest of the map is faded, and blue lines run from it to the spec sections and sheets its scope covers. The panel on the right is open to Roofing’s Schedule tab, where Bids due reads Dec 7, 2026, the date in the Wave 2 header above the card.

Stage

See where each package stands

Stage groups the same cards by how far each package has moved: Drafted, Out to bid, Leveled and Awarded, with a count beside each column.

After award lists Buyout, Submittals, Construction and Closeout with a count beside each, even at zero, so you can see how much of the pipeline is still ahead.

Bring it to the weekly precon meeting. The Drafted column is the list of packages that still need to go out.

The map grouped by stage: Drafted (20), Out to bid (5), Leveled (4) and Awarded (8), plus After award listing Buyout, Submittals, Construction and Closeout at 0. General Conditions and Millwork are under Drafted; Doors, Acoustical Ceilings, Drywall and Flooring under Out to bid; Masonry, Roofing, Glass and Glazing and Fire Protection under Leveled; Demolition, Cast-in-Place Concrete, Structural Steel, Plumbing and HVAC/Mechanical under Awarded.
The scope band grouped by stage: Drafted (20), Out to bid (5), Leveled (4) and Awarded (8), each with its count beside the name. After award lists Buyout, Submittals, Construction and Closeout, all at 0.

Filter

Find the specs no scope covers

Filter works on top of any grouping. Its menu is split by band: Issuance for drawings and specs together, Discipline for drawings, Division and Coverage for specs, and Bid stage, Name and Status for scopes.

Coverage has one option, Not carried by a scope. The number beside it is how many spec sections on the project aren’t tied to a scope. Pick it and every section tied to a package drops off the map. The division counts change to match, so 26 Electrical reads 0/3: none of the three sections left is tied to a scope.

In the shot below, those three are Identification for Electrical Systems, Wiring Devices and Surge Protective Devices, directly above the Electrical package. Before that package goes to contract, ask the electrical bidders whether their numbers include labeling, wiring devices and surge protection. Then add the sections to the scope or write them in as exclusions.

The map filtered to spec sections not tied to a scope: 23 HVAC 0/2 with sections 23 05 19 and 23 33 00, 26 Electrical 0/3 with 26 05 53, 26 27 26 and 26 43 00, and 27 Communications 0/1 with 27 10 00, each above its scope cards.
The same divisions with the coverage filter on and Hide selected. Only spec sections no scope covers are left: two under 23 HVAC, three under 26 Electrical and one under 27 Communications. The counts now read 0/2, 0/3 and 0/1, because none of the sections left is tied to a scope.

Filter

Hide the rest or dim it

An active filter shows as a chip in the toolbar, like Spec coverage: Not carried by a scope. Click its x to clear it, or use Clear filters in the menu.

At the bottom of the Filter menu, Filtered items sets what happens to everything that doesn’t match. Hide takes it off the map. Dim fades it, so the neighboring sections stay in view.

The map toolbar with an active filter chip reading Spec coverage: Not carried by a scope, and the Filter menu open with Coverage expanded to a checked Not carried by a scope option showing 14, a Clear filters item, and Filtered items set to Hide, with Dim below it.
The toolbar shows the filter chip Spec coverage: Not carried by a scope, with an x to clear it. The Filter menu is open with Coverage expanded: Not carried by a scope is checked, and the 14 beside it is the number of uncovered spec sections on the project. Clear filters is below, then Filtered items, set to Hide, with Dim under it.

Saved views

Save the layout you check every morning

Changing the grouping marks the view as Edited and puts a Save view button beside it. Name it something like Bid waves and it joins the views menu under My views, where you can rename or delete it later.

To give the rest of precon the same layout, tick Share with the project team when you save.

The map’s views menu open, listing Full map, then a My views section with a saved view named Bid waves checked, followed by Rename and Delete view.
The views menu, opened from Full map in the toolbar. A saved view named Bid waves is listed and checked under My views, with Rename and Delete view at the bottom.

What stays put

Keep your place on the drawings

Only the scope band regroups. Sheets stay grouped by discipline, and spec sections stay in their CSI division columns whichever option you pick.

Prefer the tree layout? Open Display and set Layout to Classic. It puts the project card on top and hangs each drawing discipline below it, with that discipline’s sheets, spec sections and scope cards together. Switching layouts resets Group scopes by to Division.

The map in the Classic layout: the project card at the top, with lines down to discipline boxes for Equipment, Fire Protection, Plumbing, Mechanical, Electrical and Telecommunications, each holding its sheets and spec sections, with its scope cards below.
The Classic layout. The project card is at the top, with lines down to a box for each drawing discipline: Equipment, Fire Protection, Plumbing, Mechanical, Electrical and Telecommunications. Each box holds that discipline’s sheets and spec sections, with its scope cards below.

Try it

Set bids due on your next three packages, switch the map to Bid date, then run the coverage filter. If the waves look wrong, the calendar’s wrong, and now you know before the subs do.

Open the map →

Put it against a real set.

Upload one project free with a work email. Struction reads the drawings, drafts the scopes trade by trade, and keeps every line pointed back at the sheet it came from.

Upload a set →